Asset Report
Baicheng Jinsheng EAF - Closed nickel operation
Report summary
Baicheng commissioned at the end of October 2009, with a total investment of RMB 400M. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- No table of contents specified
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Asset Report
Long - Closed nickel operation
A detailed analysis of the Long nickel operation.
$2,250
Asset Report
Dongmau EAF - Closed nickel operation
A detailed analysis of the Dongmau EAF nickel operation.
$2,250
Asset Report
Yulin Wei - Closed nickel operation
A detailed analysis of the Yulin Wei nickel operation.
$2,250