Bairendaba Yindu zinc mine
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key issues
- Mining
- Process
Tables and charts
This report includes the following images and tables:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Bairendaba Mining zinc mine
A detailed analysis of the Bairendaba Mining zinc mine.
$2,250Guelb el Rhein iron ore mine
Due to a high strip ratio and low raw ore grade, Guelb el Rhein has one of the highest mining costs in our dataset.
$2,250El Aouj iron ore mine
A feasibility study for Stage 1 of the 11 Mtpa El Aouj deposit was completed at the end of 2015; the mine will start operating in Q1 2027.
$2,250