Asset report

Baiyin copper smelter

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The Baiyin Copper Smelter commissioned in 1960 at capacity of 32 100tpy of copper and 170 000 tonnes of sulphur acid. It reached full capacity in 1965. Initially the smelter flowsheet consisted of fluidised bed roasting reverberatory furnace smelting Peirce Smith converters and anode production. Off gas from the fluidised bed roaster and converters is collected and converted to sulphuric acid. In 1976 a major expansion was undertaken by removing fluidised bed roasting and adding a 50m2...

What's included

This report contains

  • Document

    Baiyin copper smelter.xls

    XLS 472.00 KB

  • Document

    Baiyin copper smelter

    PDF 641.32 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Process overview
  • Products
  • Costs
  • Economic assumptions

Tables and charts

This report includes 13 images and tables including:

Images

  • Detailed map
  • Flowsheet
  • Production
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Feed preparation
  • Smelting process
  • Auxiliary plants
  • Products: Table 1
  • Products allocation
  • Costs: Table 1
  • Economic assumptions: Table 1

You may be interested in?

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898