Asset Report

Baiyin No.3 zinc smelter

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The original capacity of the No3 Smelter was 35kt/a zinc. In 2001 a major smelter renovation plan was instigated with the intention of raising the capacity to 75kt/a slab zinc. This included infrastructure improvement as well as sinter and sulphuric acid plant upgrades, the enlargement of the ISF to standard size, installation of large distillation columns and lead refinery expansion. 

What's included

This report contains

  • Document

    Baiyin No3 (ISF) zinc smelter.xls

    XLS 534.00 KB

  • Document

    Baiyin No.3 zinc smelter

    PDF 539.08 KB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
    • Location / Transport
    • Conc. Receipt / Storage
    • Sinter Plant
    • Acid Plant
    • Smelting Furnace
    • Refining
    • Casting Plant
    • Slag Disposal
    • Other
  • Products
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 3 images and tables including:

Tables

  • Key facts: Table 1

Images

  • Location maps: Image 1
  • Flowsheet

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898