Asset Report

Baiyin No.3 zinc smelter

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

09 June 2017

Baiyin No.3 zinc smelter

Report summary

The original capacity of the No3 Smelter was 35kt/a zinc. In 2001 a major smelter renovation plan was instigated with the intention of raising the capacity to 75kt/a slab zinc. This included infrastructure improvement as well as sinter and sulphuric acid plant upgrades, the enlargement of the ISF to standard size, installation of large distillation columns and lead refinery expansion. 

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
    • Location / Transport
    • Conc. Receipt / Storage
    • Sinter Plant
    • Acid Plant
    • Smelting Furnace
    • Refining
    • Casting Plant
    • Slag Disposal
    • Other
  • Products
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 3 images and tables including:

  • Key facts: Table 1
  • Location maps: Image 1
  • Flowsheet

What's included

This report contains:

  • Document

    Baiyin No3 (ISF) zinc smelter.xls

    XLS 467.50 KB

  • Document

    Baiyin No.3 zinc smelter

    PDF 993.89 KB

Other reports you may be interested in

Browse reports by Industry Sector