Asset report

Baiyin North West zinc smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Construction of the Baiyin North West Zinc Smelter (BNWZS) commenced in the late 1980s and it was commissioned in 1992. The BNWZS had a nominal capacity of 100kt/a slab zinc and uses the Jarosite Process. However official capacity is now reported at 130kt/a but this is due to the incorporation of capacity from another plant acquired by the Baiyin Group in 2012.

What's included

This report contains

  • Document

    Baiyin North West zinc smelter

    PDF 565.15 KB

  • Document

    Baiyin-North West zinc smelter.xls

    XLS 530.50 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Projects
  • Location maps
  • Participation
  • Process overview
  • Products
  • Costs
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 14 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet
  • Products: Image 1
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Process overview: Table 4
  • Products: Table 1
  • Products: Table 2
  • Costs: Table 1
  • Economic assumptions: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898