Asset Report

Bannockburn (Closed) gold mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Initially Bannockburn ore was trucked to Tower Hill mill near Leonora. In 1991 the plant from the Gabanintha mine was moved onto the Bannockburn site. Mining restarted in September 1991 on stockpiled material and reached full 600kt capacity in its first full year of operation. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Mining
  • Process

Tables and charts

No table or charts specified

What's included

This report contains:

  • Document

    Bannockburn (Closed) gold mine

    XLS 112.50 KB

  • Document

    Bannockburn (Closed) gold mine

    PDF 1.10 MB

  • Document

    Bannockburn (Closed) gold mine

    ZIP 945.48 KB