Construction of the smelter started in 2005, with completion and commissioning in May 2006. Design capacity was 100kt/a slab zinc and 190kt/a sulphuric acid. The smelter uses the Jarosite residue process. Commissioning of an expansion of the smelter by 100kt/a to 200kt/a slab zinc, comprising a separate plant alongside the existing smelter was completed in 2009. Most plant areas were twinned in the expansion, however only one casting plant is used for both production lines.
Table of contents
- Summary
- Key issues
- Other
Tables and charts
This report includes 7 images and tables including:
- Detailed map
- Xamba (Zijin) Electrolytic Flowsheet
- Feed Preparation
- Roaster and Acid Plant
- Leaching and Purification
- Tankhouse, Melting and Casting
What's included
This report contains: