Asset Report

Beartrack (Closed) gold mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Mining was completed at the end of the first quarter 2000. Revenue from residual gold production since September 2000 is offset against restoration and closure costs by Meridian. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Mining
  • Process

Tables and charts

No table or charts specified

What's included

This report contains:

  • Document

    Beartrack (Closed) gold mine

    XLS 113.50 KB

  • Document

    Beartrack (Closed) gold mine

    PDF 1.19 MB

  • Document

    Beartrack (Closed) gold mine

    ZIP 960.31 KB