Bellevue mine
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Mining
- Processing
- Infrastructure
- Power
- Water
- Capex
Tables and charts
This report includes the following images and tables:
- Detailed Map
What's included
This report contains:
Other reports you may be interested in
Bellevue (Closed) gold mine
A detailed analysis of the Bellevue (Closed) gold mine.
$2,250Bibiani mine
A detailed analysis of the Bibiani Gold Mine.
$2,250El Aouj iron ore mine
A feasibility study for Stage 1 of the 11 Mtpa El Aouj deposit was completed at the end of 2015; the mine will start operating in Q1 2027.
$2,250