Asset Report
Björkdal gold mine
Report summary
Bjorkdal is a combined open-pit and underground mining operation, producing four saleable concentrates (Knelson, gravity, middlings and flotation concentrates). The Bjorkdal mine is located 28km northwest of the town of Skelleftea and 750km noth of Stockholm. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Mining
- Processing
- Off-take agreements
- Power
- Royalties & Taxes
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains: