Asset report

Bolanos zinc mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

In 2015 Bolaños operated the El Alacran underground mine and a conventional Pb Zn flotation plant with an actual capacity of 35kt/month (420kt/a) and there are not any expansion plans in place. Until the end of 2012 Bolaños processed some old tailings. Since then only fresh ore from the underground mine has been milled.

What's included

This report contains

  • Document

    Bolanos zinc mine

    XLS 552.00 KB

  • Document

    Bolanos zinc mine

    PDF 582.02 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Operations
  • Fiscal and regulatory
  • Economic assumptions
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898