Asset report

Bolivar Sierra zinc mine

From

$1,350.00

You can pay by card or invoice

Get this report

From

$1,350.00

You can pay by card or invoice

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

Bolivar Sierra is an underground operation, utilising room-and-pillar and sub-level stoping methods. The Piedras Verdes processing plant is located 5km from the mine and adopts conventional flotation. Initially it had a processing capacity of 1,000t/d but in September 2013 a new circuit was installed, increasing the capacity to 2,000t/d. Towards the end of 2015 Sierra Metals was producing at a rate of approximately 2,500t/d and in 2016 throughput was averaged 2,800t/d through 2016. The Company are now taking the necessary steps to increase the daily throughput further to 3,000t/d and the objective is to reach 3,500t/d by year end 2017.

What's included

This report contains

  • Document

    Bolivar Sierra zinc mine

    XLS 565.00 KB

  • Document

    Bolivar Sierra zinc mine

    PDF 657.36 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898