Asset report

Bombore gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

Bombore is the largest undeveloped oxide gold deposit in West Africa. The deposit will be mined using open pit methods in the first 8 years, producing ore at a rate of 5.5Mt/a. Stockpile processing will continue for 3 years on completion of mining activities. Ore will be processed in a combined heap leach and carbon in leach (CIL) circuit with average annual gold production estimated at 116koz (over an 11 year production period).

What's included

This report contains

  • Document

    Bombore gold mine project

    PDF 470.55 KB

  • Document

    Bombore gold mine project

    XLS 122.50 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

Asset report

Boké bauxite mine

Asset report

Kimbo bauxite mine

    
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898