Asset Report
Browns Creek (Closed) gold mine
Report summary
Hargraves Resources acquired the mine and surrounding tenements from Newcrest Mining in 1994. Hargraves has since developed an underground mine from the bottom of the open pit previously mined by Newcrest. Hargraves was acquired by Durban Roodepoort Deep Limited in late 1999. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Mining
- Process
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Asset Report
Illinois Creek (Closed) gold mine
A detailed analysis of the Illinois Creek (Closed) gold mine.
$2,250
Asset Report
Valdez Creek (Closed) gold mine
A detailed analysis of the Valdez Creek (Closed) gold mine.
$2,250
Asset Report
Basin Creek (Closed) gold mine
A detailed analysis of the Basin Creek (Closed) gold mine.
$2,250