Asset report

Budel zinc smelter

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

Located near Eindhoven in the Netherlands the Budel smelter uses the roast leach electrowin process and has a production capacity of 260kt/a slab zinc.

What's included

This report contains

  • Document

    Budel zinc smelter.xls

    XLS 544.00 KB

  • Document

    Budel zinc smelter

    PDF 775.41 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Process overview
  • Products
  • Costs
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 14 images and tables including:

Images

  • Detailed map
  • Production
  • Costs: Image 1
  • Flowsheet

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Products: Table 1
  • Products
  • Costs: Table 1
  • Economic assumptions: Table 1
  • Feed Preparation
  • Roaster and Acid plant
  • Leaching and Purification
  • Tankhouse, Melting and Casting

You may be interested in?

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898