Asset Report

Budel zinc smelter

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Located near Eindhoven in the Netherlands, the Budel smelter uses the roast-leach-electrowin process and has a production capacity of 260kt/a slab zinc. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Emissions
  • 2022
  • 2020
  • 2019
  • 2018
  • 2017
  • 2015
  • Pre 2010
  • 2000-2009
  • 1990-1999
  • 1970-1989

Tables and charts

This report includes 8 images and tables including:

  • Budel Emission Intensity Quartile ranking – total global production - tonnes Zn
  • Detailed map
  • Flowsheet
  • Feed Preparation
  • Roaster and Acid Plant
  • Leaching and Purification
  • Tankhouse, Melting and Casting

What's included

This report contains:

  • Document

    Budel zinc smelter

    PDF 1.64 MB

  • Document

    Budel zinc smelter

    ZIP 1.15 MB