Bulghah is an open pit operation utilising conventional blast-load-haul mining methods. Ore is processed by crushing, dump and heap leaching, and carbon in column recovery.Gold production is around 35 to 60 thousand ounces per annum and the mine is a low cost operation. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.