Asset report

Casino copper mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

In January 2013 Western Copper completed a feasibility study for the Casino project. Feasibility study was initiated in January 2012. At the end of 2012 Western Copper indicated the major development milestones could be achieved in the following timeframe. Considering the scale of this project and the required infrastructure development Wood Mackenzie conservatively assumes first gold dore production in 2020 and first copper concentrate production in 2023 one year more than Western...

What's included

This report contains

  • Document

    Casino copper mine project

    XLS 539.50 KB

  • Document

    Casino copper mine project

    PDF 1013.83 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Infrastructure
  • Costs
  • Operations
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 4 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1
  • Reserves and resources: Table 1
  • Costs: Table 1

You may be interested in

Asset report

Eagle nickel operation

Asset report

LaRonde gold mine

    
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898