Asset Report

Cerro Los Gatos zinc mine project

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The project consists of underground mining and a 2.5kt/d processing rate milling facility with a life of mine of 12 years. Steady-state ore production expected to be reached in the first year following the end of the pre-production period. Lead and zinc concentrates are to be shipped for exports. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
    • Detailed map
  • Mining
  • Processing
  • Power
  • CAPEX
  • Royalties and taxes
  • Permitting

Tables and charts

This report includes 2 images and tables including:

  • Cerro Los Gatos Emission Intensity Quartile ranking – total global production - tonnes Zn equivalent

What's included

This report contains:

  • Document

    Cerro Los Gatos zinc mine project

    XLS 386.00 KB

  • Document

    Cerro Los Gatos zinc mine project

    PDF 1.67 MB

  • Document

    Cerro Los Gatos zinc mine project

    ZIP 1.10 MB