Asset Report

Cerro Los Gatos zinc mine project

Get this report

$2,250

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQ's about online orders
- Find out more about subscriptions

13 September 2019

Cerro Los Gatos zinc mine project

Report summary

The project consists of underground mining and a 2.5kt/d processing rate milling facility with a life of mine of 12 years. Steady-state ore production expected to be reached in the first year following the end of the pre-production period. Lead and zinc concentrates are to be shipped for exports. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
    • Detailed map
  • Mining
  • Processing
  • Power
  • CAPEX
  • Royalties and taxes
  • Permitting

Tables and charts

This report includes 1 images and tables including:

What's included

This report contains:

  • Document

    Cerro Los Gatos zinc mine project

    XLS 519.00 KB

  • Document

    Cerro Los Gatos zinc mine project

    ZIP 1.10 MB

  • Document

    Cerro Los Gatos zinc mine project

    ZIP 1.10 MB

Trusted by leading organisations