Asset report

Chalice (Closed) gold mine

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The Chalice plant originally shared some of the infrastructure and personnel from Resolute's Higginsville mine 25km to the south west. In 1997 the Higginsville mill was mothballed and from 1998 ore from Higginsville has been processed at Chalice. Higginsville ore is included in the analysis for Chalice shown here from 1998 on. Western Australia introduced a royalty on gold production of 1.25% from July 1998. The royalty increased to 2.5% in July 2000 at gold prices above A $450/oz;...

What's included

This report contains

  • Document

    Chalice (Closed) gold mine

    XLS 120.50 KB

  • Document

    Chalice (Closed) gold mine

    PDF 377.96 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Operations
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898