Asset Report
Chengmen Shan copper mine
Report summary
Chengmen Shan is located in Jiujiang, Jiangxi Province approximately 300km by rail from Jiangxi Copper Corp's (JCC) Guixi smelter. The mine achieved its first production in 2002 and Phase II was completed in late 2014. Phase III is ongoing and is expected to be completed in 2023. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Mining
- Process
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Black Butte copper mine project
A detailed analysis of the Black Butte copper mine project.
$2,250
Asset Report
Palabora copper mine
A detailed analysis of the Palabora copper mine.
$2,250
Asset Report
Carmacks SxEw copper mine project
A detailed analysis of the Carmacks SxEw copper mine project.
$2,250