Asset report

Clarksville zinc smelter

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The Clarksville electrolytic zinc smelter was built on a greenfield site and commissioned in 1979. The design capacity was for a production of 81.6kt/a zinc and 270t/a cadmium. Production has gradually been increased by a series of minor improvements and capacity is estimated at 120kt/a in 2005 limited generally by roasting. Oxygen in roasting was introduced in 1987 and a pressure swing absorption (PSA) plant was installed in 1992. The Clarksville smelter was designed to treat Tennessee...

What's included

This report contains

  • Document

    Clarksville zinc smelter.xls

    XLS 536.00 KB

  • Document

    Clarksville zinc smelter

    PDF 836.52 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Process overview
  • Products
  • Costs
  • Economic assumptions

Tables and charts

This report includes 14 images and tables including:

Images

  • Detailed map
  • Flowsheet
  • Production
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Feed preparation
  • Roaster & Acid Plant
  • Leaching & Purification
  • Tankhouse, melting & Casting
  • Products: Table 1
  • Products
  • Costs: Table 1
  • Economic assumptions: Table 1

You may be interested in?

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898