Asset Report

Clarksville zinc smelter

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

28 November 2018

Clarksville zinc smelter

Report summary

The Clarksville electrolytic zinc smelter was built on a greenfield site and commissioned in 1979.  The design capacity was for a production of 81.6kt/a zinc and 270t/a cadmium.  Production has gradually been increased by a series of minor improvements and capacity is estimated at 120kt/a in 2005, limited generally by roasting.  Oxygen in roasting was introduced in 1987 and a pressure swing absorption (PSA) plant was installed in 1992. The Clarksville smelter was designed to treat Tennessee...

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Process overview
  • Products
  • Costs
  • Economic assumptions

Tables and charts

This report includes 14 images and tables including:

  • Key facts: Table 1
  • Detailed map
  • Participation: Table 1
  • Flowsheet
  • Feed preparation
  • Roaster & Acid Plant
  • Leaching & Purification
  • Tankhouse, melting & Casting
  • Production
  • Products: Table 1
  • Products
  • Costs: Image 1
  • Costs: Table 1
  • Economic assumptions: Table 1

What's included

This report contains:

  • Document

    Clarksville zinc smelter.xls

    XLS 465.50 KB

  • Document

    Clarksville zinc smelter

    PDF 1.26 MB