The Clarksville electrolytic zinc smelter was built on a greenfield site and commissioned in 1979.  The design capacity was for a production of 81.6kt/a zinc and 270t/a cadmium.  Production has gradually been increased by a series of minor improvements and capacity is estimated at 120kt/a in 2005, limited generally by roasting.  Oxygen in roasting was introduced in 1987 and a pressure swing absorption (PSA) plant was installed in 1992. The Clarksville smelter was designed to treat Tennessee...

What's included?

This report includes 2 file(s)

  • Clarksville zinc smelter PDF - 836.52 KB 8 Pages, 10 Tables, 4 Figures
  • Clarksville zinc smelter.xls XLS - 536.50 KB

Description

This Zinc Metals Smelter report provides a detailed analysis of the cost profile, process overview, products and key issues for this asset, as well as a detailed location map.

For zinc producers, advisors and financial companies, this report provides an understanding of the value and efficiency of the operation. Use this report to understand the competitive position, identify acquisition opportunities and strengthen business strategies.

Wood Mackenzie's cost methodology is the established global industry standard, relied on by the world’s leading investment banks and mining companies to make strategic, operational and investment decisions.

Our analysts are based in the markets they analyse, working with high-quality proprietary cost databases and cost curve analyses to write consistent and reliable insights. Our database includes over 2,450 asset analyses covering more than 1,000 companies worldwide.

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Process overview
  • Products
  • Costs
  • Economic assumptions

In this report there are 14 tables or charts, including:

  • Key facts
    • Key facts: Table 1
  • Summary and key issues
  • Location maps
    • Detailed map
  • Participation
    • Participation: Table 1
  • Process overview
    • Flowsheet
    • Feed preparation
    • Roaster & Acid Plant
    • Leaching & Purification
    • Tankhouse, melting & Casting
  • Products
    • Production
    • Products: Table 1
    • Products
  • Costs
    • Costs: Image 1
    • Costs: Table 1
  • Economic assumptions
    • Economic assumptions: Table 1
Requester's name : .............
Department : .............
Authoriser's Name : .............
Authoriser's signature : .............
Date : .............
Cost Centre : .............

Questions about this report?

Frequently Asked Questions

Mailenquiries@woodmac.com
  • Europe: +44 131 243 4699
  • Americas: +1 713 470 1900
  • Asia Pacific: +61 2 8224 8898
contact us

Why Wood Mackenzie?

As the trusted source of commercial intelligence for the world's natural resources sector for more than 40 years, we empower clients to make better strategic decisions with objective analysis and advice. Find out more...