Cleveland steel plant
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key issues
- Participation
- Steel plant overview
- Iron ore
- Coal
- Coke
- Metallics
- Energy
- Capital costs
- Operating cash costs
Tables and charts
This report includes the following images and tables:
-
Detailed mapDownstream productsFinished steel production
-
Production (Mt)Capital costsTotal operating cash costs - Finished steelOperating cash cost tableEconomic assumptionsKey raw materials rates
What's included
This report contains:
Other reports you may be interested in
Middletown steel plant
Single blast furnace steel plant producing flat-rolled and coated sheet. The planned DRI-EAF project was cancelled on weak economics.
$2,250Burns Harbor steel plant
Cliffs acquired the integrated plant in 2020; it runs two BFs. BF D suffered a major issue in 2020, and BF C is set for relining in 2027.
$2,250Indiana Harbor East steel plant
Currently a single 3.6 Mtpa blast furnace steel plant with great potential to capture downstream value as the Calvert slab contract ended.
$2,250