Asset report

Cockle Creek zinc smelter

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The Cockle Creek smelter in New South Wales Australia operated between 1961 and 2003. At the time of closure the smelter had an estimated production capacity of 93kt/a slab zinc. The smelter has since been demolished and the site rehabilitated.

What's included

This report contains

  • Document

    Cockle Creek zinc smelter.xls

    XLS 511.00 KB

  • Document

    Cockle Creek zinc smelter

    PDF 722.13 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Process overview
  • Products
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 9 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Feed preparation
  • Products
  • Sinter and Acid plant
  • Smelting Furnace
  • Refining
  • Casting

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898