Asset report

Colquijirca (El Brocal) zinc mine

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

El Brocal processes Pb Zn ore from its Tajo Norte open pit mine and copper ore withthe high arsenic from Marcapunta Norte underground mine. There are two processing plants. Plant 1 with a capacity of 7kt/d and Plant 2 with a capacity of 11kt/d. Full milling capacity of 18kt/d was achieved on 4Q 2015.

What's included

This report contains

  • Document

    Colquijirca (El Brocal) zinc mine

    XLS 596.00 KB

  • Document

    Colquijirca (El Brocal) zinc mine

    PDF 603.27 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Operations
  • Costs
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in?

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898