Asset Report
Contact Lake (Closed) gold mine
Report summary
The deposit is part of the Preview Lake Joint Venture, an area covered by agreements between Cameco and Uranerz. Mine employees work a seven day on/seven day off schedule, utilising an 80 person on-site camp. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Mining
- Process
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Asset Report
Dona Lake (Closed) gold mine
A detailed analysis of the Dona Lake (Closed) gold mine.
$2,250
Asset Report
Mercur (Closed) gold mine
A detailed analysis of the Mercur (Closed) gold mine.
$2,250
Asset Report
Kookynie (Orient Well) (Closed) gold mine
A detailed analysis of the Kookynie (Orient Well) (Closed) gold mine.
$2,250