Asset Report

Cotabambas copper mine project

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

12 March 2018

Cotabambas copper mine project

Report summary

The accompanying analysis is based on the results of the preliminary economic assessment (PEA) released by the company in Nov 2015. This PEA assumes a conventional open pit operation and a 80kt/d concentrator to produce a clean copper concentrate with an average grade of 27%Cu, 11.5g/t Au and 130g/t Ag. No molybdenum production is expected. The concentrator is expected to process sulphide, mixed and oxide ores. No significant impact is expected from the deleterious elements in the concentrates. The copper concentrate is expected to be shipped through the Matarani port located 598km away. This includes a route of Cotabambas-Challhuahuacho-Espinar-Imata-Arequipa-Matarani port. Some spare parts could be transported from El Callao to Cotabambas 1,195km away.

Table of contents

Tables and charts

This report includes 2 images and tables including:

  • Key facts: Table 1
  • Location maps: Image 1

What's included

This report contains:

    Other reports you may be interested in

    Browse reports by Industry Sector