Asset Report
Cote gold mine project
Report summary
The property area spans 521 square kilometres, comprising the Cote deposit, the Chester 1 and numerous zones of mineralisation located in the Porcupine Mining Division. The project is planned as an open-pit mining operation, with ore treatment in a carbon-in-pulp (CIP) processing plant to produce gold dore on-site. In Q4 2018, a feasibility study was completed with two possible development options. Under the Base Case scenario, mine life was estimated at 18+ years with average annual gold production of 367koz/a over the life of mine (428koz/a in years 1 - 12). Initial capex was estimated at US$1.2 billion.
Table of contents
- Summary
- Key issues
- Emissions
- Mining
- Processing
- Power
- CAPEX
- Royalties & Taxes
Tables and charts
This report includes 2 images and tables including:
- Cote Emission Intensity Quartile ranking – Total global production - Tonnes Au equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Wasamac gold mine project
A detailed analysis of the Wasamac gold mine project.
$2,250
Asset Report
Golpu gold mine project
A detailed analysis of the Golpu gold mine project.
$2,250
Asset Report
NuevaUnion gold mine project
A detailed analysis of the NuevaUnion gold mine project.
$2,250