Asset Report

Courageous Lake gold mine project

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Courageous Lake property comprises 62 Federal Mining Leases and 26 Federal Mining Claims across 54km of greenstone belt with a total area of 33ha located 240km northeast of Yellowknife, in the North West territories. Open pit mining is planned over a 15 year mine life. Ore will be processed in a High Pressure Grinding Roll (HPGR), with ball mill grinding, flotation and pressure oxidation (POX) and a carbon-in-leach (CIL) leach circuit. Mill capacity is estimated at 6.4Mt/a producing ~385koz/a over the life of mine.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing
  • CAPEX

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Courageous Lake gold mine project

    XLS 118.50 KB

  • Document

    Courageous Lake gold mine project

    PDF 1.11 MB