Asset Report
Courageous Lake gold mine project
Report summary
The Courageous Lake property comprises 62 Federal Mining Leases and 26 Federal Mining Claims across 54km of greenstone belt with a total area of 33ha located 240km northeast of Yellowknife, in the North West territories. Open pit mining is planned over a 15 year mine life. Ore will be processed in a High Pressure Grinding Roll (HPGR), with ball mill grinding, flotation and pressure oxidation (POX) and a carbon-in-leach (CIL) leach circuit. Mill capacity is estimated at 6.4Mt/a producing ~385koz/a over the life of mine.
Table of contents
- Summary
- Key issues
- Mining
- Processing
- CAPEX
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
06 December 2022
New Prosperity (Fish Lake) gold mine project
Asset Report
New Prosperity (Fish Lake) gold mine project
A detailed analysis of the New Prosperity (Fish Lake) gold mine project.
$2,25017 April 2023
Windfall Lake Gold Mine Project
Asset Report
Windfall Lake Gold Mine Project
A detailed analysis of the Windfall Lake Gold Mine Project.
$2,25029 September 2022
Lynn Lake gold mine project
Asset Report
Lynn Lake gold mine project
A detailed analysis of the Lynn Lake gold mine project.
$2,250