Asset Report

Cozamin zinc mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Capstone hold a 100% stake in the property subject to a 3% NSR payable to Grupo Bacis S.A. de C.V, a Mexican resource company. The project is situated close to Zacatecas City with a population of 130,000. Infrastructure around the area is good and includes railroads and electrical power. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key Issues
  • Emissions
  • Mining
  • Processing
  • Royalties and taxes

Tables and charts

This report includes 4 images and tables including:

  • Cozamin Emission Intensity Quartile ranking – total global production - tonnes Zn equivalent
  • Detailed map

What's included

This report contains:

  • Document

    Cozamin zinc mine

    XLS 447.50 KB

  • Document

    Cozamin zinc mine

    PDF 1.68 MB

  • Document

    Cozamin zinc mine

    ZIP 1.15 MB