Asset Report
Cozamin zinc mine
Report summary
Capstone hold a 100% stake in the property subject to a 3% NSR payable to Grupo Bacis S.A. de C.V, a Mexican resource company. The project is situated close to Zacatecas City with a population of 130,000. Infrastructure around the area is good and includes railroads and electrical power. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key Issues
- Emissions
- Mining
- Processing
- Royalties and taxes
Tables and charts
This report includes 4 images and tables including:
- Cozamin Emission Intensity Quartile ranking – total global production - tonnes Zn equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Hellyer Mine Restart (Closed) zinc mine
A detailed analysis of the Hellyer Mine Restart zinc mine.
$2,250
Asset Report
Pend Oreille (Closed) zinc mine
A detailed analysis of the Pend Oreille zinc mine.
$2,250
Asset Report
Huanzala (Santa Luisa) zinc mine
A detailed production, commercial and cost competitive analysis of the Huanzala (Santa Luisa) zinc mine.
$2,250