Asset report

Cripple Creek & Victor (Pikes Peak) gold mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Cripple Creek is a typical open pit operation using trucks and shovels. All the ore was heap leached prior to 2015 but as part of a Mine Life Expansion programme (MLE 2) programme a 2Mt/a mill was constructed to treat the high grade ore i.e ore grades greater than 2.3g/t.

What's included

This report contains

  • Document

    Cripple Creek & Victor (Pikes Peak) gold mine

    PDF 1.03 MB

  • Document

    Cripple Creek (Pikes Peak) gold mine.xls

    XLS 442.50 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Production
  • Operations
  • Costs
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 9 images and tables including:

Images

  • Detailed map
  • Production: Image 1
  • Cash costs

Tables

  • Key facts: Table 1
  • Economic assumptions: Table 1
  • Production: Table 1
  • Operations
  • Costs: Table 1
  • Costs: Table 2

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898