Crixas (Serra Grande) mine
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key issues
- Mining
- Processing
Tables and charts
This report includes the following images and tables:
-
Detailed map
What's included
This report contains:
Other reports you may be interested in
Serra Leste (Northern System) iron ore mine
The smallest of Vale's Northern System mines, it is still a high-grade and low-cost. Production is to reach its ultimate rate by 2028.
$2,250Serra Norte (Northern System) iron ore mine
Vale's Carajás region first iron ore mine. Its high-grade, low-strip reserves and large scale put it at the bottom of the industry curve.
$2,250Volta Grande gold mine project
A detailed analysis of the Volta Grande gold mine project.
$2,250