Asset Report
Curraghinalt gold mine project
Report summary
Curraghinalt will be an underground operation utilising sublevel longhole open stoping, cut and fill and longhole upper stoping mining methods. The mine has an estimated life of 11 years. The process plant will have a design capacity of 1.4kt/d and comprise a conventional crushing, milling and carbon-in-leach (CIL) circuit. The accompanying analysis is based on the Feasibility Study published in January 2017.
Table of contents
- Summary
- Key issues
- Mining
- Processing
- CAPEX
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Salares Norte gold mine project
A detailed analysis of the Salares Norte gold mine project
$2,250
Asset Report
Black Volta gold mine project
A detailed analysis of the Black Volta gold mine project.
$2,250
Asset Report
Tocantinzinho gold mine project
A detailed analysis of the Tocantinzinho gold mine project.
$2,250