Asset Report

Detour Lake gold mine

Get this report

$2,250

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQ's about online orders
- Find out more about subscriptions

13 December 2018

Detour Lake gold mine

Report summary

The original Detour Lake mine was operated by Placer Dome between 1983 and 1999. The current mine is based on the bulk open pit mining of a major low grade resource delineated on the 242km property. The processing plant comprises a standard gravity, cyanidation and carbon-in-pulp (CIP) circuit operating at 55kt/d and ramping up to 61kt/d in 2017. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing
  • CAPEX

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Detour Lake gold mine

    XLS 136.00 KB

  • Document

    Detour Lake gold mine

    ZIP 1003.01 KB

  • Document

    Detour Lake gold mine

    ZIP 1003.21 KB

Trusted by leading organisations