Asset report

Detour Lake gold mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The original Detour Lake mine was operated by Placer Dome between 1983 and 1999. The current mine is based on the bulk open pit mining of a major low grade resource delineated on the 242kmproperty. The processing plant comprises a standard gravity cyanidation and carbon in pulp (CIP) circuit operating at 55kt/d and ramping up to 61kt/d in 2017.

What's included

This report contains

  • Document

    Detour Lake gold mine

    XLS 141.50 KB

  • Document

    Detour Lake gold mine

    PDF 465.39 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Operations
  • Costs
  • Sales contracts
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898