Asset report

Driefontein - East (Closed) gold mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The East Driefontein Section exploits the VCR Carbon Leader and Main reefs. East Driefontein commenced production in 1972. The merger of the mine with West Driefontein took place with effect from 1st July 1981. Currently three shaft systems are being developed in the East Driefontein section; No 1 tertiary shaft No 4 SV in the East and the No 5 SV in the South. Development results in the VCR are quite variable with some very high grade areas.

What's included

This report contains

  • Document

    Driefontein - East (Closed) gold mine

    XLS 117.00 KB

  • Document

    Driefontein - East (Closed) gold mine

    PDF 401.85 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898