Asset report

Eagle nickel operation

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

The Eagle Mine is a high grade nickel/copper deposit with Probable Ore Reserves estimated in accordance with JORC of 5.18 million tonnes at 2.93% nickel and 2.49% copper anticipated to produce on average approximately 17,000 tonnes per annum nickel and 17,000 tonnes per annum copper, with gold, cobalt, platinum and palladium by-products over the current life of mine of approximately 8 years.

What's included

This report contains

  • Document

    EagNi.xls

    XLS 786.50 KB

  • Document

    Eagle nickel operation

    PDF 324.87 KB

Table of contents

  • Key facts
  • Summary and key issues
    • Detailed map
  • Participation
  • Geology
  • Reserves and resources
    • Mining
    • Process
  • Production
  • Costs
  • Timeline

Tables and charts

This report includes 9 images and tables including:

Images

  • Production: Image 1
  • Production: Image 2
  • Costs: Image 1
  • Location maps: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Cashflow

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898