Asset Report

El Aouj iron ore mine

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The El Aouj mine is a proposed open-pit iron ore operation in the Tiris-Zemmour area of Northern Mauritania. It is a 50:50 joint venture between Glencore and SNIM. In Phase 1, the El Aouj “East” deposit, would produce 11 Mtpa of 66.5% Fe concentrate. A Feasibility Study for Stage 1 of the development of the El Aouj East deposit was completed at the end of 2015 but no further work has been undertaken. The life of Stage 1 of the operation is 41 years, Once the Stage 1 project is established the process plant and mine design has incorporated the option to double the capacity of the mine to 22 Mtpa, but we have only modelled Stage 1 at this point in the projects development.

Table of contents

  • Summary
  • Key Issues

Tables and charts

This report includes 11 images and tables including:

  • Participation
  • Marketable reserves (at 01/01/2024)
  • Production
  • Production
  • Operations
  • Infrastructure
  • Cash Costs
  • Cash Costs
  • Product Quality
  • Economic Assumptions

What's included

This report contains:

  • Document

    El Aouj.xls

    XLS 179.50 KB

  • Document

    El Aouj iron ore mine

    PDF 1.08 MB