Asset Report
El Arco copper minesite project
Report summary
In 2021 Grupo Mexico was anticipating an open pit mine and a conventional 110kt/a ore concentrator and a 35kt/a cathode plant. The SxEw plant will start first and one year later the concentrator. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Emissions
- Power
- Water
- CAPEX
- Operating
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Kingking copper minesite project
A detailed analysis of the Kingking copper minesite project.
$2,250
Asset Report
Haquira copper minesite project
A detailed analysis of the Haquira copper minesite project.
$2,250
Asset Report
Mina Justa copper minesite project
A detailed analysis of the Mina Justa copper minesite project.
$2,250