The accompanying analysis considers production of copper in concentrate and copper cathode at El Soldado. Production from the El Soldado underground mine ceased in 2011 with all subsequent production from the El Cobre sulphide concentrator being sourced from open-pit mining. A major fault system exists that imposes material constraints on existing mine planning and which poses significant rock mechanics problems in exploiting the resource.
Table of contents
- Summary
- Key issues
- Emissions
- Mining
-
Process
- Mill
- Leach /SxEw
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
El Arco copper minesite project
A detailed production and cost competitive analysis of the El Arco copper minesite project.
$2,250
Asset Report
El Teniente copper minesite
A detailed production and cost competitive analysis of the El Teniente copper minesite.
$2,250
Asset Report
Ray copper minesite
A detailed analysis of the Ray copper minesite.
$2,250