Asset Report

El Teniente copper minesite

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The El Teniente Division is part of a mine-metallurgical complex that includes eight underground mines, a small open pit (Rajo Sur), three milling plants with two flotation sections with a total capacity of 140kt/d ore, a 1.31Mt conc/a smelter and a small 12kt/a SxEw plant. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key Issues
  • Emissions
  • Electricity
  • Water
  • Capex
  • Operating costs
  • Mining
  • The Nuevo Nivel de Mina was replaced by the New Mine Level Project
  • Diamond Project
  • Andesite Project
  • Pacifico Superior and Diablo Regimiento Projects
    • Mill
    • SxEw
  • Royalties and taxes
  • Community relations
  • Environmental reclamation

Tables and charts

This report includes 3 images and tables including:

  • El Teniente Emission Intensity Quartile Ranking - total global production - tonnes Cu equivalent
  • El Teniente SxEw Emission Intensity Quartile Ranking - tonnes of Cu equivalent
  • Detailed map

What's included

This report contains:

  • Document

    El Teniente copper minesite

    PDF 2.14 MB