Asset report

El Teniente copper minesite

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The El Teniente Division is part of a mine metallurgical complex that includes eight underground mines a small open pit (Rajo Sur) three milling plants with two flotation sections with a total capacity of 140kt/d ore a 1.31Mt conc/a smelter and a small 12kt/a SxEw plant that produces copper from the treatment of various waste water sources and leaching of smelter flue dusts. According to Codelco's 2017 PND the Rajo Sur is expected to close by the end of 2021.

What's included

This report contains

  • Document

    El Teniente copper minesite

    XLS 613.00 KB

  • Document

    El Teniente copper minesite

    PDF 590.89 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Infrastructure
  • Costs
  • Operations
  • Production
  • Sales contracts
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 4 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1
  • Reserves and resources: Table 1
  • Operations: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898