Asset report

Enchi gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

The Enchi project is being advanced by Pinecrest Resources. Key shareholders in Pinecrest include Kinross and Sandstorm Gold. A preliminary economic assessment (PEA) study on the project was completed in Q2, 2015 and updated in December 2015 to reflect a contractor-operated operation. The study is based on an 9 year open pit operation with an ore throughput capacity of 3Mt/a. The ore will be treated via heap leaching with the final product being a gold doré.

What's included

This report contains

  • Document

    Enchi gold mine project

    PDF 495.22 KB

  • Document

    Enchi gold mine project

    XLS 114.00 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed Map

Tables

  • Key facts: Table 1

You may be interested in

Asset report

Kimbo bauxite mine

Asset report

Kindia bauxite mine

    
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898