The operation is a combination of underground mining with the ore treated in a conventional processing plant. A small tailings re-treatment project started in 2015. Pan African developing the much larger Elikhulu tailings re-treatment project with an assumed annual gold production of circa 50koz over 14 years. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Mining
- Processing
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Winkelhaak (to end-1996) (Closed) gold mine
A detailed analysis of the Winkelhaak (to end-1996) (Closed) gold mine.
$2,250
Asset Report
Kinross (to end 1996) (Closed) gold mine
A detailed analysis of the Kinross (to end 1996) (Closed) gold mine.