Asset Report

Evander (Kinross, Winkelhaak, Leslie & Bracken from 1997) gold mine

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The operation is a combination of underground mining with the ore treated in a conventional processing plant. A small tailings re-treatment project started in 2015. Pan African developing the much larger Elikhulu tailings re-treatment project with an assumed annual gold production of circa 50koz over 14 years. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing

Tables and charts

This report includes the following images and tables:

  • Detailed map

What's included

This report contains:

  • Document

    Evander (Kinross, Winkelhaak, Leslie & Bracken from 1997) gold mine

    XLS 140.00 KB

  • Document

    Evander (Kinross, Winkelhaak, Leslie & Bracken from 1997) gold mine

    PDF 1.22 MB