Asset Report

Evander (Kinross, Winkelhaak, Leslie & Bracken from 1997) gold mine

Get this report

$2,250

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQ's about online orders
- Find out more about subscriptions

08 March 2019

Evander (Kinross, Winkelhaak, Leslie & Bracken from 1997) gold mine

Report summary

The operation is a combination of underground mining with the ore treated in a conventional processing plant. A small tailings re-treatment project started in 2015. Pan African developing the much larger Elikhulu tailings re-treatment project with an assumed annual gold production of circa 50koz over 14 years. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Evander (Kinross, Winkelhaak, Leslie & Bracken from 1997) gold mine

    XLS 137.50 KB

  • Document

    Evander (Kinross, Winkelhaak, Leslie & Bracken from 1997) gold mine

    PDF 1.07 MB

  • Document

    Evander (Kinross, Winkelhaak, Leslie & Bracken from 1997) gold mine

    ZIP 1.05 MB

Trusted by leading organisations