Asset Report
Fetekro gold mine project
Report summary
Following a strategic exploration review in 2016, Endeavour identified Fetekro as a top priority greenfield target. It is located in north-central Côte d’Ivoire, ~500km from Abidjan, within the northern-end of the Oumé-Fetekro Greenstone Belt. Only a small portion of the property has been explored so far, as the priority has been the Lafigué deposit. An initial PEA based on Indicated Resource of 1.2Moz, with an 8-year mine life, demonstrated positive results.
Table of contents
- Summary
- Key Issues
- Mining
- Processing
- Capital Costs
- Closure Costs
- Power
Tables and charts
This report includes 1 images and tables including:
- Detailed Map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Salares Norte gold mine project
A detailed analysis of the Salares Norte gold mine project
$2,250
Asset Report
Springpole gold mine project
A detailed analysis of the Springpole gold mine project
$2,250
Asset Report
Black Volta gold mine project
A detailed analysis of the Black Volta gold mine project.
$2,250