Asset report

Flin Flon zinc smelter

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The Flin Flon zinc smelter was commissioned in 1930 with a capacity of 20kt/a zinc to treat concentrates from the Flin Flon mine. By the 1980s capacity had reached 85kt/a based on roasting in wedge roasters followed by neutral and weak acid leaching. Leach residue was routed to the copper smelter for precious metals recovery to copper anode and for zinc recovery by the fuming of reverbatory furnace slag. Sulphur dioxide from the roasting operation was vented to atmosphere. In 1989 the...

What's included

This report contains

  • Document

    Flin Flon zinc smelter

    PDF 598.97 KB

  • Document

    Flin Flon zinc smelter.xls

    XLS 535.50 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Process overview
  • Products
  • Costs
  • Economic assumptions

Tables and charts

This report includes 14 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet
  • Products: Image 1
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Process overview: Table 4
  • Products: Table 1
  • Products: Table 2
  • Costs: Table 1
  • Economic assumptions: Table 1

You may be interested in?

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898