Asset Report

Flin Flon (closed) copper smelter

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Flin Flon copper smelter was commissioned in 1930 to treat concentrate from the Flin Flon mine. At commissioning the smelter operated three roasters, a coal fired reverberatory furnace, two Peirce-Smith converters and a casting wheel for 180kg blister cakes. A fourth roaster was added in 1936 and a third converter was added in 1940. In 1951, a drying plant to enable the treatment of leach residue from the on-site zinc smelter and a slag fuming plant to recover zinc from reverberatory...

Table of contents

  • No table of contents specified

Tables and charts

No table or charts specified

What's included

This report contains:

  • Document

    Flin Flon (closed) copper smelter

    PDF 1.16 MB

  • Document

    Flin Flon copper smelter

    ZIP 1.08 MB