Asset Report
Florida Canyon (Bongara) zinc mine project
Report summary
Florida Canyon is a high-grade zinc Mississippi Valley type deposit containing associated lead and silver. It is a significant greenfield project that lends itself to underground mining methods. The accompanying analysis assumes a 2.5kt/d ore mill and two flotation circuits to obtain Zn and Pb concentrates. The concentrates are expected to be trucked offsite to smelters. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Mining
- Processing
- Royalties and taxes
Tables and charts
This report includes 2 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
15 April 2022
Bongara Restart zinc mine project
Asset Report
Bongara Restart zinc mine project
A detailed analysis of the Bongara Restart zinc mine project.
$2,25021 April 2023
Namib zinc mine project
Asset Report
Namib zinc mine project
A detailed analysis of the Namib zinc mine project
$2,25007 December 2022
Corani zinc mine project
Asset Report
Corani zinc mine project
A detailed production, commercial and competitive analysis of the Corani zinc mine project.
$2,250