Asset Report

Florida Canyon (Bongara) zinc mine project

Get this report

$2,250

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQ's about online orders
- Find out more about subscriptions

13 September 2019

Florida Canyon (Bongara) zinc mine project

Report summary

Florida Canyon is a high-grade zinc Mississippi Valley type deposit containing associated lead and silver. It is a significant greenfield project that lends itself to underground mining methods. The accompanying analysis assumes a 2.5kt/d ore mill and two flotation circuits to obtain Zn and Pb concentrates. The concentrates are expected to be trucked offsite to smelters. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing
  • Royalties and taxes

Tables and charts

This report includes 2 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Bongara (Florida Canyon) zinc mine.xls

    XLS 515.00 KB

  • Document

    Florida Canyon (Bongara) zinc mine project

    ZIP 1.10 MB

  • Document

    Florida Canyon (Bongara) zinc mine project

    ZIP 1.06 MB

Trusted by leading organisations