Asset Report

Freegold Joint Metallurgical Scheme (Closed) gold mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Joint Metallurgical Scheme (JMS) comprises two distinct operations. The first treats slimes from tailings dams in three pyrite flotation plants with a combined capacity of 18Mt/a, owned by Free State Geduld, President Steyn and President Brand. Pyrite concentrates are treated in a roaster prior to gold recovery from the calcine. Sulphuric acid and uranium oxide production in the 6.6Mt/a SxEw uranium plant provide co-product credits. The second operation involves the treatment of...

Table of contents

  • No table of contents specified

Tables and charts

No table or charts specified

What's included

This report contains:

  • Document

    Freegold Joint Metallurgical Scheme (Closed) gold mine

    XLS 109.50 KB

  • Document

    Freegold Joint Metallurgical Scheme (Closed) gold mine

    PDF 1.13 MB

  • Document

    Freegold Joint Metallurgical Scheme (Closed) gold mine

    ZIP 963.80 KB