Asset Report
Garfield copper smelter
Report summary
Smelting has taken place on the site of the existing smelter since 1906. During 1974-1978 a major modification involved the replacement of the green feed reverberatory furnaces with Noranda reactors. The plant was closed from mid-1985 to June 1987 due to closure of the Bingham mining operations and a new anode casting system was installed prior to re-opening. Acid was first produced at the smelter in 1916 and, since 1937, nine "modern" contact acid plants have been built. In addition a...
Table of contents
- Emissions
- Environmental
Tables and charts
This report includes 6 images and tables including:
- Garfield Emission Intensity Quartile Ranking - total global production - tonnes Cu
- Detailed map
- Flowsheet
- Feed preparation
- Smelting process
- Auxiliary plants
What's included
This report contains:
Other reports you may be interested in
Asset Report
Garfield copper refinery
A detailed analysis of the Garfield copper refinery.
$2,250
Asset Report
Altonorte copper smelter
A detailed analysis of the Altonorte copper smelter.
$2,250
Asset Report
Tongling (Jinchang) (closed) copper smelter
A detailed analysis of the Tongling (Jinchang) copper smelter.
$2,250