Asset Report
Getty copper mine project
Report summary
The project comprises of the Getty North and Getty South deposits which are located in the Highland Valley Mining Camp, close to Highland Valley Mine. Initially ore from the south pit will be fed to the processing plant and by year 8 only the ore from the north pit will be fed. The Company was expected to treat sulphide and leach ore to produce Cu cathode and Mo trioxide. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset
Table of contents
- Detailed map
- CAPEX
- Mining
- Process
Tables and charts
This report includes 1 images and tables including:
What's included
This report contains:
Other reports you may be interested in
Asset Report
Carmacks SxEw copper mine project
A detailed analysis of the Carmacks SxEw copper mine project.
$2,250
Asset Report
Black Butte copper mine project
A detailed analysis of the Black Butte copper mine project.
$2,250
Asset Report
Gunnison SxEw copper mine project
A detailed analysis of the Gunnison SxEw copper mine project.
$2,250