Asset report

Getty copper mine project

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The project comprises of the Getty North and Getty South deposits which are located in the Highland Valley Mining Camp close to Highland Valley Mine. Initially ore from the south pit will be fed to the processing plant and by year 8 only the ore from the north pit will be fed. The Company was expected to treat sulphide and leach ore to produce Cu cathode and Mo trioxide.

What's included

This report contains

  • Document

    Getty copper mine project

    PDF 642.82 KB

Table of contents

  • Summary and key issues
  • Key facts
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Costs
  • Operations
  • Timeline

Tables and charts

This report includes 3 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1
  • Reserves and resources: Table 1

You may be interested in?

Asset report

Eagle nickel operation

Asset report

LaRonde gold mine

    
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898