Asset report

Glogow II copper smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The Glogow II smelter was commissioned as a state enterprise in 1978 with a capacity of 180kt/a copper including 150kt/a ex concentrates and mainly from the company's Polkowice and Rudna mines. By 2001 the capacity had been increased to in excess of 200kt/a due to process optimisation and de bottlenecking. Early problems with the flash furnace concerned the concentrate grain size feed arrangements waste heat boiler problems and high refractory wear. High refractory wear in the flash...

What's included

This report contains

  • Document

    Glogow II copper smelter

    PDF 709.73 KB

  • Document

    Glogow II copper smelter.xls

    XLS 482.50 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Process overview
  • Products
  • Costs
  • Economic assumptions

Tables and charts

This report includes 13 images and tables including:

Images

  • Detailed map
  • Flowsheet
  • Production
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Feed preparation
  • Smelting process
  • Auxiliary plants
  • Products: Table 1
  • Products allocation
  • Costs: Table 1
  • Economic assumptions: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898